RESOURCES

ESCATEC BLOG

Filter by topic

Total 10 Pages

Go To Page

Go

Precision farming technology; a new growth sector for OEMs

Precision farming technology is helping save water, control our use of ...

How long should a value engineering (VAVE) project take?

How long should a Value Engineering (VAVE) project take and what should it ...

The value of outsourcing product design to an EMS provider

  Many Original Electronics Manufacturers (OEMs) choose to outsource ...

8 steps of a sustainable new product development process

In the 21st century, disruption for OEMs is ever-present. New technology is ...

Value engineering: cutting supply chain costs not product quality

Value engineering seeks to reduce costs and increase the value of a product. ...

How VA/VE ‘follows the money’ to deliver more value to your customers

‘Follow the money’ has always been a handy investigative tip. And it’s one ...

9 steps to carry out a VA/VE Function Analysis

Function Analysis is an essential component of the Value Engineering/Value ...

7 cost-saving ideas for manufacturers & 1 that works

Who doesn’t want to reduce costs? Reduced costs lead to either increased ...

When’s the right time to start a value engineering process?

Products can be ’value engineered’ during any of the three stages of the ...

How to cut manufacturing costs without sacrificing quality

With recent global events causing massive disruption to electronics ...

Total 10 Pages

Go To Page

Go
resources-group-med